Full Day Packages - Catering

Comments

4 comments

Date Votes
  • Joel Nisbett

    At one point we added the ability to not require functions at the service order level, and you could instead choose to assign functions at an item level. I'm thinking that enhancement might have been related to the use case you're describing…maybe?

     https://supportcenter.ungerboeck.com/hc/en-us/articles/4752087230615-Non-Function-Service-Orders

  • Seth Halvaksz

    Following

  • Rob Rebman

    There is the ability to split a service order and move the new service order to the correct function.  2 steps.  Interested to see if there are other best practices. 

  • Minka Verkaar

    Hey Anthony Costantino I think this process could be set up more efficiently than the options we currently have. I’m familiar with the following approaches:

    1. Jaarbeurs uses a package that only contains the allocations and books all items in separate orders, linked to the correct function. For example: Function Line Welcome = coffee/tea/cookies, Function Line Break = coffee/tea/fruit, Function Line Lunch = sandwiches, etc. The risk with this option is that the unit of the package is not linked to the number of items included—this requires manual review. However, I believe they handle this with “Sync to Ordered” or “Sync to Event Attendance.” The advantage is that you only need to update the Function Lines when there is a time change, and they work extensively with Event Templates where the packages are already preconfigured. Regarding this option, there is also the possibility to split the package across different Function Lines—the item Joel Nisbett is referring to. However, the number of clicks required for that action is not proportional to the benefit it provides. Maybe for one big event yes, but when you talk about DDR Packages in a Meeting Centre with high volume and short lead times, it is not user friendly. In addition, this is an organization-level parameter, which means that Service Orders for other types of events would no longer necessarily need to be linked to a Function. This introduces additional drawbacks, especially for departments that do not work with packages and for them the Function should remain mandatory to prevent errors.
    2. MEMOX has set up full packages that are linked to a single Function Line (e.g., Function Line Meeting), and they manually adjust the start and end times of the items in the Service Order. The advantage here is that units are linked to the package. The downside is that the start and end times are more “hidden” at the Service Order level instead of the Function level and as a result you lose the benefit of having the Function Schedule serve as the main source of your Event. 

    Hope this helps! 