% Completed on a Task does not Automatically Update

Comments

4 comments

Date Votes
  • Vernica Lodha

    They do update automatically - u need to refresh the page to see the change.

  • Duncan Hilliard

    Sorry, this is the wrong Loom link - I need to do the correct one. 

  • Duncan Hilliard

    Here is the correct Loom link: https://www.loom.com/share/172a1f041fb34c3aa1b76a0fa63fe846
    The % Complete does not update for the client on a task

  • Vernica Lodha

    this never existed, Duncan. The %completion is a manual field that the user can select from the dropdown if they like. The automation is only linking status of the sub-task <> status of the task

Please sign in to leave a comment.