Job Status 'Prepare Quote'
- Account name
Belfast Waterfront & Ulster Hall Limited
- Region
EMEA
- Client version (Enterprise)
24.42024120301
- Description of the issue
Client is looking to add a new Status called 'Prepare Quote', but they unsure at which code to assign it too. They tried to find the answer in the Job Statuses article, but are still wondering what the purpose is behind the sequencing and whether reporting is affected. - Please see an overview of their current statuses below

- Links to articles where you've looked for solutions and also other steps you've taken to research the issue.
https://supportcenter.ungerboeck.com/hc/en-us/articles/9099077450391-Job-Statuses
-
Asking Samy Kheloufi if he can review this and comment on the best practice
-
Hi Joppe Borsboom and Seth Halvaksz ,
First, I would have used instead this support centre article:
https://supportcenter.ungerboeck.com/hc/en-us/articles/204552078-Event-Statuses
Second, as it says in the article:
Status Codes
Momentus Enterprise uses status code to determine certain behavior:
- If you use Cascading (Waitlist) Bookings, all waitlist statuses must have a code of 29 or below. These status codes must be sequential and are usually in the 21-29 range.
- Codes between 30-79 are considered Firm statuses. The first time an event moves to a status with a code of 30 or higher, the Decision Date field on the Edit Event screen defaults to the current date to record when the event first became a Firm status.
- Codes 80 - 89 are Cancelled or Lost statuses and used with cancelling events.
- Codes 90 - 99 are Archived Statuses and used with archiving or removing events.
- If you use Contracts, you can link the Event Status and Contract Status.
Since the “Prepare Quote” status they want to add is a not confirmed status, it falls in the range 29 or below.
However, Belfast has already used the code 29 for "Pending Cancellation." I recommend moving (create a new status, assign the new status and delete the old one) the "Pending Cancellation" status to a much lower code, as the event is unlikely to happen, so it can be placed between 1 and 10.
And instead use the status 29 for the “Quote” status.
Additionally, I suggest using contract statuses for more detailed tracking, such as "Quote in Preparation," "Quote/Contract Sent," "Quote/Contract Signed," etc., rather than having these details at the event level.
Any further support, such as redefining statuses, assigning the new "Pending Cancellation" status to existing events, or assistance with contract statuses, would require billable consulting hours that can be taken from a Services Direct or as ad-hoc consulting.
Cheers,
Samy
-
Cheers, Samy Kheloufi! I have shared your extensive answer with the customer. I'm sure this will help them in the right direction.
-
Thanks Samy Kheloufi
Please sign in to leave a comment.
Comments
4 comments
Date Votes